Manufacturing Facility in Mexico
The Austin Company, in connection with Alberici Constructors, designed and constructed a new manufacturing facility for Stanley Electric Mexico.
Research Hospital Research and Development Facility
When St. Jude Children’s Research Hospital needed a GMP facility to further its mission of finding cures for catastrophic childhood illnesses, they turned to The Austin Company to implement this critical project.
Baking Facility Relocation and Renovation
Lyon Bakery was founded by three like–minded friends in the spring of 2000. Skilled in the art of making gourmet artisan breads, the bakery expanded from modest beginnings into a thriving business, serving customers throughout the Washington and Baltimore metropolitan areas.
747 Aircraft Assembly Plant
When Boeing’s 747 aircraft assembly plant was completed in 1968 by The Austin Company, it was the largest volume building in the world.
Automotive Component Manufacturing Facility
The Austin Company, in connection with Alberici Constructors, designed and constructed a manufacturing facility for Tokyo Roki de Mexico in Santa-Fe IV Industrial Park in Silao, Guanajuato, Mexico.
Pharmaceutical Technical Center in Lake Forest IL
The Austin Company provided architecture and engineering services for an R&D technical center for Hospira, an international pharmaceutical company.
Commercial Printing Production Facility
The Austin Company provided design-build services for a production facility for Cox Target Media. At the time the facility was completed, it was the largest industrial building in Pinellas County in St. Petersburg, Florida.
Bakery Production Facility in Front Royal VA
The Austin Company completed a $17-million contract to design, engineer and construct a new bakery and warehouse for Interbake Foods in Richmond, Virginia.
Community College Athletics & Aquatics Complex
The Austin Company provided overall site and facility programming, architectural and interior design, engineering, and construction phase support for this new Athletics and Aquatics Complex at the Santiago Canyon College campus.
M3 Consolidated Laboratories
The Austin Company provided Northrop Grumman Aerospace Systems with architectural planning, design and engineering services for the remodeling of 87,400 SF within the existing M3 building.
Automotive Parts Manufacturing Facility
The Y-Tec Keylex Mexico, S.A. de C.V. (YKM) automotive parts manufacturing and assembly facility was implemented as a design-build project at the Mazda automotive complex in Guanajuato, Mexico.
777 Aircraft Assembly Facility
When The Boeing Company needed to expand its massive aircraft assembly facility in order to produce the 777, Boeing’s value jetliner, the company once again called on The Austin Company to tackle the project.
Toothpaste Manufacturing Facility
Colgate-Palmolive, a global leader in oral care, solicited The Austin Company to provide site location consulting, and design and build a new state-of-the-art, 250,000 SF dental cream facility in Morristown, Tennessee.
Heavy Industrial Manufacturing Facility
Mitsubishi Power Systems America (MPSA) needed to expand their facilities to increase production of key gas turbine parts, provide complete steam turbine services and assemble advanced, fuel-efficient gas turbines.
Select Tennessee Site Certification Program
To increase the inventory of sites ready for industrial development, the Tennessee Department of Economic and Community Development contracted with Austin Consulting to develop and implement Select Tennessee, a rigorous site certification program.
Bakery Production Facility in Lebanon PA
The 22,000 SF Bohemia bakery, with 85 employees, turns out 336,000 bagels a day, seven days a week.
Delta IV Rocket Factory
Major components of the rocket, including the common booster core, were manufactured in a facility designed, engineered and constructed by The Austin Company in a joint venture with J.S. Alberici Construction Company.
BSL-3 Laboratory Renovation
The Austin Company completed an important renovation project for Pfizer in downtown Kalamazoo, Michigan. The project included updating a vacated laboratory to current Biosafety Level 3 (BSL-3) Criteria of the National Institutes of Health and the Centers for Disease Control and Prevention.