LABS AND CLEAN ROOMS DESIGNED AND BUILT WITH FLEXIBILITY FOR THE FUTURE

diam-fi2

DECADES OF EXPERIENCE

Our experience have taught us that organizations change—their missions adapt over time and their laboratory facilities need to adjust accordingly.

Austin’s fully integrated team incorporates flexibility and modularity into the design and construction of every project. Whether it’s a new building or an expanded facility, we consider the long-term function of the space, and we design, engineer and build with the future in mind.

20180904_155328

UNIQUE SOLUTIONS TO MEET CLINICAL DEMANDS

Our Fully Integrated Team Has Deep Knowledge of the Industry, Including:

  • Good Laboratory Practices.
  • National Institute of Health Regulations.
  • U.S. and International GMP Requirements and Standards.
  • Engineered Safety at Equipment, Room, and Access Levels.
  • LEED® Design and Construction Requirements.
LANLfi1-5in

SINCE THE 1940S, AUSTIN HAS DESIGNED AND BUILT LABS

  • Bioscience Labs.
  • Pharmaceutical.
  • Quality Control.
  • Vivarium and R&D Labs.
  • Food And Consumer Products Labs.
  • Manufacturing and Electronic Labs.
  • Petroleum Labs.
  • Aerospace.
TheAustinMethod_Logo

THE AUSTIN METHOD®

The Austin Method is the proprietary design-build method developed in 1901 to provide clients a single-source for the design, engineering, and construction of a project. Austin can provide services from start to finish—or any step in between—to meet the client’s objectives for a project on time and within budget.

Austin offers multiple approaches in implementing a project. These generally can be classified into either a design-bid-construct or design-build project approach. In addition, Austin offers The Austin Method, which applies stringent project controls and combines the advantages of “design-bid construct” and “design-build” approaches into a competitive bid, cost-effective, and accelerated-schedule project implementation.

TO LEARN MORE ABOUT OUR LAB AND CLEAN ROOM PROJECTS, VIEW OUR PROJECT GALLERY