Baking Plant Expansion
Austin’s integrated design-build team is providing planning, design, engineering, preconstruction, and construction services for this 228,000 SF expansion to their cookie plant.
Tortilla Chip Expansion
40,000 SF, single-story expansion of a confidential snack food production facility in Texas, with work initiated in August 2024 and completion targeted for late 2026.
Facility Expansion and Renovation
Bob Evans decided to expand its existing USDA meat processing operations to include ready-to-eat products as well as other prepared foods.
Project Candlelight
The Austin integrated existing equipment, added new components, and made necessary modifications, along with detailed engineering and utility evaluations.
Project Runway
Fair Oaks Foods entrusted The Austin Company as the design-builder for their new 150,000-square-foot greenfield bacon production plant.
Smoked Fish Processing and Packaging Facility
Acme called on Austin to help them expand their current production capabilities through a facility renovation project.
Wafer Bar Manufacturing Facility
The Austin Company provided integrated design services for Tandem Foods’ wafer bar manufacturing facility located in Cypress, California
Boiler MACT Upgrade
Pfizer selected The Austin Company to oversee the expansion and upgrade of the Maximum Achievable Controls Technology (MACT) of its Portage, Michigan, central plant.
Chemical Processing and Painting Facility
Austin added 13,500 SF to an existing building to meet Bombardier's need for a Metal Surface Finishing Facility (MSFF) at its Learjet complex.